Laboratory decoration hydropower engineering design method

Laboratory decoration hydropower engineering design method

1. The water and electric pipe routing civil works are laid under the floor through the pre-embedded pipe and led to the designated position of the central station. For the side platform, the water pipe and the electric pipe route are buried in the wall and led to the designated position. The rest of the work is done by the laboratory contractor. For the central station, the water and electric pipelines are hidden in the middle of the base cabinet, and the water and electric pipelines are hidden behind the base cabinet. The water in the emergency flushing device is introduced by a pre-embedded pipe in the wall.

2. The laboratory contractor installs and connects various cables, pipelines, pre-embedded pipes, sockets and faucets from the access points left by the civil builder. Mark all the faucets, sockets, service columns, etc. on the relevant map.

3. Cables and water pipes must have relevant certification to prove their reliability.

4. Each fume hood has 2 electrical outlets and a cold water tap to meet the requirements of the user. The power outlet on the workbench is indicated on the relevant side view.

5. All switches and sockets must be installed outside the fume hood.

6. All air circuit breakers in the control box have switches and sockets labeled.

7. The installation process must comply with local regulations. All electrical installations and inspections must meet the set requirements and be recorded. These recorded documents will be delivered to the end user.

8, all power supplies, electrical appliances from the sink, emergency flushing devices, etc. have a certain safety distance.

9. Set up the instrument grounding device at the appropriate location in the laboratory building. Some instruments XRF, AAS, ICP, etc. require a grounding  grounding resistance of less than 0.5 Ω.

10. A schedule is required to determine the transit time. Ensure that the lab has enough space to store the accessories and install them immediately after shipment.

11. All installation work must meet the relevant standards and be verified by electrical engineers.

12. The electrical circuit should be separated from the local area network and telephone line to avoid signal interference.

13. The inspection process must submit a certificate. All results are submitted to the user.

14. One year warranty period from the date of project delivery.

15. Quality problems caused by laboratory contractors or related subcontractors during transportation, installation and inspection are guaranteed.

Over the years, our construction scope has covered many industries such as medicine, industry and electronics. Mainly engaged in the design and construction of purification projects such as P2 laboratory, HIV laboratory, PCR laboratory, clean operating room, clean ward, clean factory, electronic factory. The level of facilities in modern laboratory renovation has been upgraded to a world-class level.

At the same time, the company also has a strong laboratory design and construction team, which can design corresponding construction plans according to the specific requirements of different construction units. The company strictly follows the "Biological and Biomedical Laboratory Biological General Guidelines" and "Laboratory Biosafety". General requirements, "Experimental animal environment and facilities", "Clean plant design specifications", "Cleanroom construction and acceptance specifications", "Ventilation and air conditioning engineering construction quality acceptance specifications" design, construction commissioning, testing, to ensure the quality of the project.

Shanghai Tianhao Purification Engineering Co., Ltd. is different from the engineering company of ordinary furniture manufacturers. Our company regards the laboratory as the whole product, effectively integrates the resources of various laboratory fields at home and abroad, and tailors it for customers. The most suitable experimental environment to meet the needs of laboratories in different industries.

Shanghai Tianhao Purification Engineering Co., Ltd. is constantly improving itself while constantly improving and perfecting its products. We are willing to strengthen contact and cooperation with colleagues and friends from all walks of life at home and abroad to create a better tomorrow for the progress of the laboratory industry.

Shower Gel

Shower Gel,Shower Cream,Body Shower Gel,Foaming Shower Gel

Guangzhou Lingxue Cosmetics Co., Ltd , https://www.lxgj188.com