1. Select good varieties: choose color palate with good palatable appearance, high yield, strong resistance, and cold resistance, such as dahongpao of Hongyeyuan type and whole leaf red.
YokeLink Automatic Splice Rated to hold a minimum 95% of RBS of the strand used, can ensure quick and reliable overhead tension splice with fast and easy installation. The conductor simply slips into color-coded, funnel-shaped end piece and enters the pilot cap automatically with a simple push. The pilot cap guides the conductor pass the set of serrated jaws and into the center of Automatic Splice. YokeLink Automatic Spliceare used on ACSR, AAC, AAAC,(Sparrow,Pigeon) conductor for an instant, positive and automatic connection, ANSI C119.4 Full Tension Class A connector.
YokeLink Wedge Connector and [C-Ring" are used to connect solid and stranded aluminum, aluminum alloy and stranded aluminum composite conductors including AAC, AAAC, ACSR, ACAR, AW, ACSR/AW and ACSS. They may also be used in non-corrosive environments to connector copper conductors.
Distribution Hardware,Cable Rope Clamp,Aluminum Anchoring Clamp,Aluminum Parallel Clamp Ningbo Yokelink Machinery Co.,Limited , https://www.yokelink.com
2. Fertilization for soil preparation: Select a plot with flat terrain, fertile soil, convenient drainage and irrigation, and low weeds. Deeply till 15-20 cm in early November. Combine deep plowing with 3,000 kg of high-quality organic fertilizer per acre and 25 kg of diammonium phosphate as a base fertilizer. . Then make a flat 1-1.2 meters wide, flattened and flattened, and put it under virtual reality.
3, timely sowing: in late November can be sown. Before sowing, we should use enough water to plant 3-4kg per acre. Mix the seeds with appropriate amount of fine sand and spread it onto the surface of the husk. Use the foot to press it or cover it with a layer of dirt and then cover the film. Then use a 2 meter bamboo strip to support a small shed 70-80 cm high and cover the film.
4. Strengthen management: On the basis of pouring sole water, no watering before emergence, 5-7 days can emerge. After the cotyledon was unearthed, the mulching film was removed for the first field weeding. When the two true leaves are grown, the second time the weeding and thinning are performed, and the first time the fertilizer is applied, the first water is poured. Generally, 10 kg of nitrogen-phosphorus compound fertilizer is applied to the top of the mu, and the second time after 15 days, the water is applied in combination with the water for the second time. Fertilizer, Mushi compound fertilizer 5 kilograms, after each harvest once, top-dressing watering, fertilization 5-10 kilograms per acre or 1,000 kilograms of human and animal manure. At the end of March of the following year, when the temperature rises, small arch shelters can be removed, ventilation can be enhanced, and high-temperature seedlings can be prevented and white rust can be prevented.
5, timely harvest: Leek grow to 4-6 leaves, plant height 10-15 cm can be listed between the large seedlings, while replanting Leek, so that can be harvested in batches until the early June clean. Pay attention to each time the income must be kept between large and small, leaving uniform, in order to increase production.